Upper site (Juniper) 5/31/07
|
Upper site (Juniper) 5/31/07
|
Upper site (Juniper) 5/31/07
|
Upper site (Juniper) 5/31/07
|
Upper site (Juniper) 5/31/07
|
Upper site (Juniper) 5/31/07
|
Upper site (Juniper) 5/31/07
|
Station Miller, up stream point of cross array, 5/31/07
|
Station Miller, up stream point of cross array, 5/31/07
|
Station Miller, up stream point of cross array, 5/31/07
|
Station Miller, up stream point of cross array, 5/31/07
|
Station Miller, up stream point of cross array, 5/31/07
|
|
Station Steller, northwestern point of cross array, 5/31/07
|
Station Steller, northwestern point of cross array, 5/31/07
|
Station Crack, downstream point of cross array, 5/31/07
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Ice worm!
|
Ice worms!
|
Ice worms are everywhere!
|
Alpha
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Paul and Alpha
|
|
Station Smel, southeastern point of cross pattern array, 5/31/07
|
Bering Glacier base camp continuous station 6/1/07
|
Bering Glacier base camp continuous station 6/1/07
|
Bering Glacier base camp continuous station 6/1/07. When I opened up the box, the GPS was dead and the batteries drained. The cause was a dead solar panel charge controller.
|
Bering Glacier base camp continuous station 6/1/07. DEAD Charge controller! I removed the GPS from the load terminals, connected directly to the batteries, and charged the batteries with a generator.
|
Bering Glacier base camp continuous station 6/13/07. On this trip, I brought a replacement for the charge controller.
|
Bering Glacier base camp continuous station 6/13/07. Replacement Charge controller!
|
Bering Glacier base camp continuous station 6/13/07. Replacement Charge controller!
|
Station Crack, downstream point of cross array, 6/13/07
|
Station BMG, center of cross array, 6/13/07. This station only has a seismometer, no GPS or solar panel.
|
Station BMG, center of cross array, 6/13/07. This station only has a seismometer, no GPS or solar panel.
|
Station BMG, center of cross array, 6/13/07. This station only has a seismometer, no GPS or solar panel.
|
Station BMG, center of cross array, 6/13/07. This station only has a seismometer, no GPS or solar panel.
|
Station Miller, upstream point of cross array, 6/13/07
|
Station Miller, upstream point of cross array, 6/13/07
|
Station Miller, upstream point of cross array, 6/13/07
|
Station Miller, upstream point of cross array, 6/13/07
|
Station Miller, upstream point of cross array, 6/13/07
|
Upper station (Juniper) 6/13/07
|
Upper station (Juniper) 6/13/07
|
Upper station (Juniper) 6/13/07
|
Upper station (Juniper) 6/13/07
|
Mt Miller
|